logo_tag
Back

Archer's Midnight Gets Disney, Marvel and Formula 1 Tie-Ups but Has Yet to Carry a Passenger

Why It MattersEntertainment and sports partnerships can build demand ahead of certification, but they do not shorten the approval path, and eVTOL economics still hinge on proving transition flight and winning regulatory sign-off.

AeroCorner

What happened

Archer Aviation has signed agreements with Disney and Formula 1, and Marvel lent its Avengers branding to a Midnight air taxi livery, but the aircraft has not yet carried a paying passenger. The Disney deal is a research agreement that Archer described as "early, exploratory research" into technical concepts and passenger experiences. Neither company has named a project, a commitment or a timeline, and the work is not tied to Archer's passenger plans, according to AVweb. Avengers: Doomsday opens in theaters on Dec. 18, 2026.

Archer's Midnight Gets Disney, Marvel and Formula 1 Tie-Ups but Has Yet to Carry a Passenger

On Nov. 12, Archer signed a multiyear agreement with Formula 1 to explore air taxi service at selected races, moving fans and VIP guests between circuits and nearby airports. The concept includes pickup and drop-off points near the tracks and flights folded into F1 hospitality and ticket packages. Chief executive Adam Goldstein pitched fans reaching the track "in 10 to 20 minutes aboard Midnight" on the Nov. 9 earnings call. Passenger flights still require regulatory approval.

Midnight is a piloted aircraft with seats for four passengers and 12 propellers: six tilt forward for cruise, and six fixed rear props are used only for vertical takeoff and landing. It is rated for up to 150 mph (240 km/h) and a maximum range of 100 miles (161 km) from six independent battery packs. Archer unveiled it in Palo Alto on Nov. 17, 2022; Goldstein and Brett Adcock founded the company in October 2018.

In the third quarter of 2026, Archer reported revenue of $5.1 million, driven by the first engine deliveries for Anduril's Omen autonomous air vehicle rather than passenger service. The net loss for the quarter was $274.6 million. Cash, cash equivalents and short-term investments stood at $1.35 billion on Sept. 30, 2026, down from $1.56 billion three months earlier.

Orders, assets and the flight-test record

United Airlines placed a conditional order for 200 aircraft, backed by a $10 million deposit paid in August 2022 for the first 100, and announced a route from Newark to the Downtown Manhattan Heliport. Archer bought Hawthorne Municipal Airport in the Los Angeles area for $126 million in November 2025. In August 2026 it agreed to take over Boeing's Wisk, Insitu and SkyGrid businesses in exchange for 19.75% of its shares, a deal it called "nearing close" in November.

As of Nov. 9, 2026, Archer had completed more than 260 piloted Midnight flights, including 100 in its piloted transition campaign, a milestone Goldstein said the company was closing in on finishing by year-end. Transition, the handoff of lift from rotors to wing, must be proven on battery power with a pilot aboard before vertical passenger service can begin. AVweb notes Midnight still needs more testing and approvals before vertical takeoff and landing passenger flights.

The UAE track

Midnight made its first flight outside the US at Al Bateen Executive Airport in Abu Dhabi in July 2025, with Abu Dhabi Aviation lined up as local operator. In October 2025, Bloomberg said the UAE review was taking longer than expected. On May 7, 2026, the UAE's General Civil Aviation Authority moved Midnight into a Restricted Type Certificate program, a pathway "to begin limited commercial operations," with no date given for a first passenger flight.

Archer's Q3 2026 results did not mention the UAE and described the company as preparing to carry passengers in Los Angeles. Goldstein said on the Nov. 9 call: "In '27, I plan to be Archer's first passenger in Midnight." Further passenger flights would follow under market survey authorization before Midnight earns a full type certificate.

Industry impact & what to watch

Brand and event partnerships are a cheap way for an eVTOL developer to keep demand narratives alive while the expensive part, certification, runs on its own clock. Disney, Marvel and F1 add visibility and potential premium-customer channels, but none of them changes what regulators require before a seat can be sold. For the segment, that separates marketing momentum from operational readiness: revenue today comes from engine deliveries to a defense customer, not from flying people.

The cash position frames the pressure. A net loss of $274.6 million in one quarter against $1.35 billion on hand means the pace of flight-test milestones and regulatory decisions matters as much as any commercial announcement. Conditional orders such as United's 200-aircraft commitment convert to revenue only after type certification and operating approvals, which is why proving transition flight with a pilot aboard is the gating item.

The dated markers worth tracking are the completion of the 100-flight transition campaign that Goldstein said was due by year-end, the close of the Wisk, Insitu and SkyGrid takeover, and any first-passenger timing tied to the UAE's restricted program or the Los Angeles plans.

Original Source

Archer Avengers Air Taxi: Disney Deal, No Passengers Yet | AeroCornerAeroCorner
Keep Exploring