logo_tag
Back

Emirates Commits $300 Million to Expand Engine Centre, Bringing GE90 and GP7200 Piece-Part Repairs In-House with GE Aerospace Support

Why It MattersAirlines with large widebody fleets are shifting engine repair work away from OEMs and outside shops, pushing more control and regulatory responsibility onto their own maintenance operations.

Emirates has committed $300 million to expand the Emirates Engine Maintenance Centre (EEMC) in Dubai, with GE Aerospace providing technical support to establish comprehensive piece-part component repair capabilities for the GE90 and Engine Alliance GP7200 engines. The agreement was announced on May 14, 2026. The GE90 powers Emirates' Boeing 777 fleet, while the GP7200 powers part of its Airbus A380 fleet. GE Aerospace will provide technical consultancy, training and knowledge transfer for Emirates' engineering workforce.

Emirates Commits $300 Million to Expand Engine Centre, Bringing GE90 and GP7200 Piece-Part Repairs In-House with GE Aero

According to Emirates Engineering, the EEMC has operated since 2014 and can complete 250 to 300 full-engine shop visits a year, with an average of 30 engines in process at any time. It already handles induction, module replacement, cleaning, inspection, minor repairs and recertification for both the GE90-115B and GP7200. Its engine test cell occupies a 24,000-square-meter site, has six engine workstations, and can test engines producing up to 150,000 pounds of thrust. The test cell is certified by the UAE's GCAA, EASA and the FAA.

Piece-part repair covers the inspection and repair of individual components once an engine has been disassembled, work airlines have historically relied on OEMs and specialist repair shops to perform. Keeping more of it in Dubai is intended to give Emirates greater control over turnaround times and to cut the handoffs, transport and cost involved in sending parts to outside suppliers. It also means the airline takes on more responsibility for specialized technical and regulatory work.

The engine investment sits within a broader vertical-integration strategy. On May 18, 2026, Emirates broke ground on a $5.1 billion engineering complex at Dubai South, covering approximately 1.1 million square meters and designed to accommodate 28 widebody aircraft at once. The facility is expected to open in 2030. In November 2025, Emirates and Rolls-Royce agreed that Emirates will perform MRO on its own Trent 900 engines from 2027, starting with fan-case repairs, while Rolls-Royce retains module repair capability within its global network.

Related Coverage · 4 stories

aviationweek.com · ge emirates develop ge90 gp7200 piece parts repairsaviationweek.comemiratesengineering.com · engine maintenance centreemiratesengineering.comemirates.com · emirates taps ge aerospace for expertise to advance piece part repair capabilities for engine maintenanceemirates.comEmirates Says Its $300 Million Expansion Will Cut Reliance On Outside Suppliers For GE90 & GP7200 Engine Repairssimpleflying.com
Keep Exploring