FAA proposes airworthiness directive for Pratt & Whitney Canada PW800 engines on Gulfstream G500 and G600, estimating $85 per engine
Why It MattersAdopting Transport Canada's directive as a U.S. rule shows how limits set by the original certifying authority carry across borders, while the $85 estimate captures only paperwork, not parts or repairs.
What happened
The FAA has proposed an airworthiness directive for all Pratt & Whitney Canada PW814GA and PW815GA engines, the powerplants certified for the Gulfstream G500 and G600. The proposal, FAA-2026-13811, was issued Nov. 9 and published Nov. 13. It would make Transport Canada's AD CF-2025-71 a U.S. requirement and counts 333 engines on U.S.-registered airplanes.

The proposal would require compliance with the Canadian directive in its entirety, with one exception: wherever the Canadian AD refers to its own effective date, the U.S. AD would use its own. Canada's directive, effective Jan. 13, 2026, states that no part may be installed or remain installed unless it meets the limits, tasks, intervals and repair limits in P&WC's airworthiness limitations manual, Issue 021, dated Oct. 8, 2025.
Transport Canada says P&WC's newer structural analyses identified a need for updated life limits, inspections and repair limits on certain parts. Canadian operators have worked under these limits since January. The FAA is accepting comments on the proposal through Dec. 28.
What the FAA's cost estimate covers
The FAA's $85 estimate covers one work-hour per engine to revise the airworthiness limitations section. It is the only action in the cost table, which includes no parts costs and no line for the replacements, inspections or repairs required once a part reaches its limit.
Neither document names the affected parts or lists the limits, which are contained in P&WC's manual.
Industry impact & what to watch
Mandating a foreign authority's directive wholesale, changing only the effective-date reference, is a routine way for the U.S. to align with the state of design on an engine type. For the G500 and G600 fleet, the practical burden sits in the manual rather than in the directive text: the limits that matter are in P&WC's Issue 021, so operators and maintenance providers will be reading that document, not the AD, to learn what comes off the airplane and when.
The $85 figure is a compliance-paperwork number. The real cost exposure arises when a part reaches a limit and needs replacement, inspection or repair, and that spend is not estimated anywhere in the proposal. Fleets that have operated under the limits since January in Canada give a reference point for how that plays out in practice.
The comment window through Dec. 28 is the next dated milestone. Comments from operators or maintenance providers on cost or compliance timing would be the first sign of whether the final rule departs from the Canadian text.

















































